Now locker floor replacement


Mike Ondra
 

In the midst of Bow locker floor replacement. See attached photos. Plywood bottom was rotting and delaminating resulting in failure of the port locker. It was cut out to within 3 inches of the perimeter. Strategy is replacement plywood to be laid on top of the remaining flange and glassed in. Using half-inch plywood as original but with with some rib reinforcing underneath to allow enough structural support for opening access. Glassing both sides.
House pipe cut off below top and above bottom. Plan is to slide a PVC pipe over top of the existing house pipe flanges and glass it in for structural integrity. At least that’s the plan so far.
Mike
Aletes SM#240

Join main@AmelYachtOwners.groups.io to automatically receive all group messages.