Re: Now locker floor replacement
Gerald Bassin
Nice job !
toggle quoted messageShow quoted text
On our SM #113 Jetlag, we managed to load up 100 gallons of water on the passage from Curaçao to Grenada due to a blocked drain in the chain locker.... We had a hatch already fitted in the port locker so it was not to hard to get down and cut an acces to the drain hole. Works fine now. We also installed a divider in the chain locker. Seems that the earlier units did not have it installed Safe sailing Gerald Bassin SV Jetlag
On 21 May 2019, at 02:13, Mike Ondra via Groups.Io <mdondra@...> wrote:
|
|