locked Re: Batteries starting to get weak - MMM - What to do -


Elja Röllinghoff Balu SM 222
 

He Scott , first many thanks for your detaild awnser . 

i have been advised at Victron and Mastervolt for 800 Ah 12Volt  in row 400 AH 24 V
Mastervolt estimates the cost incl assembly to approx € 40000.00
with 2 combi inverters
3000/100 .
von Victron habe ich ein Angebot für alle Componenten
incl 1 st combi inverter
5000/135
Victron has only one external BMS for all batteries but offers
to connect before the BMB as an additional protection before overload the battery protection
components for land current/generator solar load and load through the light machine to double protection.

sowiso would have a reserve BMS with the 102 € are not important .

I find an Altinator Mastervolt Alpha
With the regulator Alpha III


Is it possible for this altinator to stop charging the butteries when the engine i running ? Withaut damage the altinator ? 

Thanks Elja 
Von meinem iPhone gesendet

Join main@AmelYachtOwners.groups.io to automatically receive all group messages.