Re: Atlantic Tower Install - Port Fixing


Ken Uber
 

Alan, the arch is fixed to gunwal, and in those locations there is bleeding inside the lasserate, indicating moisture through the connection.  This is not so bad, its where the bracing was fixed in the centre of the stern, where the centre pole for the rope railing is, these fixings penetrated the core in this area and over time has allowed moisture to ingress. such that the lasserate is always damp.


--
Regards
 
Ken Uber
SY Eleuthera
SM #007
Melbourne
Australia
0411 096 804

Join main@AmelYachtOwners.groups.io to automatically receive all group messages.