Re: Continious soft shackle


Peter Forbes
 

Doug,

Thanks very much for that a good link.

Peter Forbes
Carango Amel 54 #035
Lymington UK
0044 7836 209730

On 2 Aug 2022, at 03:31, Doug Smith via groups.io <dugsmith98@...> wrote:

Eric, 
They are pretty easy to make with some 1/4 “ dyneema. I searched for a while but couldn’t find anyone selling what I was trying to replace. 
With the right fids, it takes about 15-20 minutes to get one of these done. Also very helpful was the Ronstan D splicer for pulling through the ends. 
I used this website to get the lengths and sizing right. 

https://l-36.com/loop.php

Thanks, Doug Smith

Amel 54-113, Aventura
Deltaville VA
Dugsmith98@...

On Aug 1, 2022, at 9:13 PM, Eric Freedman <kimberlite.ef@...> wrote:



Does anyone know of a source of the continuous soft shackle shown in Bills image below?

Location USA.

Fair Winds

Eric

Kimberlite Amel Super Maramu #376

 

 

 

 

Main Mast External Halyard Block:

image001.png



Join {main@AmelYachtOwners.groups.io to automatically receive all group messages.